Homepage

ALLHC and FLOW Mark Milestone with Topping Off Ceremony for A-FLOW ML1 Data Center in PH

September 10, 2024
PR PHOTO ALLHC and FLOW topping off (shovel)

Laguna, Philippines– A-FLOW, a leading developer and operator of Data Centers in the Philippines, marked a major construction milestone with the recent topping off of its new ML1 Data Center.

A-FLOW is the joint-venture partnership between FLOW Digital Infrastructure (FLOW) and AyalaLand Logistics Holdings Corp. (ALLHC). The companies broke ground on the site in December 2022.

Strategically situated in Biñan, Laguna, the three-building carrier-neutral campus is designed to meet the highest standards of energy efficiency, scalability and security, with a focus on site resiliency and reliability. With the completion of the first building’s structural framework, the Data Center is slated to begin operations in Q4 2024 with an initial 6MW capacity ready for service.

Key features of the facility include:• Robust and secure infrastructure ensuring operational continuity• Dual power feeds for enhanced redundancy• Hyperconnected environment establishing network diversity and flexibility• Scalability to accommodate future business growth

Key representatives from FLOW and ALLHC were present at the ceremony, together with partners and vendors who played significant roles in the design and construction of the Data Center.

A-FLOW President and FLOW CEO Amandine Wang expressed, "The topping off of ML1 is a testament to the vision, commitment and dedication of all our vendors, partners and consultants who have contributed to this achievement. Their presence highlights the collective effort and shared ambition that has driven this project forward up to this pivotal moment."

A-FLOW Chairman and ALLHC President and CEO Robert S. Lao added, "This project embodies our commitment to supporting the growing demand for data storage as the Philippines transitions to a digital economy. We are proud to contribute and participate in this opportunity to provide the country’s need for Data Center solutions and digital infrastructure within the Philippines."

Monocrete Construction Philippines President and Chairman Manuel S. Mendoza stated, "Without the support of the A-FLOW team, this milestone could not have been possible. Congratulations to the shared success of the Monocrete and A-FLOW team!"

PR PHOTO ALLHC and FLOW topping off (shovel)
PR PHOTO ALLHC and FLOW topping off (shovel)
PR PHOTO ALLHC and FLOW topping off (slab)
PR PHOTO ALLHC and FLOW topping off (slab)

L-R: A-FLOW Chairman and ALLHC President and CEO Robert S. Lao, FLOW Head of Design & Construction Mr. Raj Kumar, A-FLOW President and FLOW CEO Ms. Amandine Wang, A-FLOW Director and ALLHC COO Patrick C. Avila, Monocrete Construction Philippines President and Chairman Manuel S. Mendoza

PR PHOTO ALLHC and FLOW topping off
PR PHOTO ALLHC and FLOW topping off
Tags:
New Developments
Share:

Latest Updates

MAKATI SOUTHPOINT EXTERIOR NIGHT

Avida Unveils Final Tower at Makati Southpoint Amid Strong Sale

March 13, 2025

Makati City, Philippines – Avida Land, Ayala Land’s mid-market residential brand, launches the final tower of Avida Towers Makati Southpoint following the strong sales of its first two towers. This move underscores Makati’s enduring appeal as a prime residential and investment destination.

Read more
ALH Leadership Team - Speakers

Ayala Land Relaunches Hospitality Brand, Betting Big on Filipino Tourism Growth

March 12, 2025

Manila, Philippines | March 11, 2025 – As the Philippines positions itself for a tourism boom, Ayala Land Hospitality (ALH) is unveiling a bold new chapter in its hospitality business, relaunching its brand with a sharper focus on authentic Filipino experiences and aggressive expansion.

Read more
Sentria Storeys Vermosa Groundreaking

Capitalizing on Cavite’s Growth: Avida Land Breaks Ground on Sentria Storeys Vermosa

March 6, 2025

Cavite, Philippines – February 22, 2025 – Avida Land, the mid-income residential brand of Ayala Land, has officially begun construction of Tower 1 of Sentria Storeys Vermosa, a 15-story building marking a significant milestone in its expansion within Cavite’s thriving property sector. Set for completion in August 2028, the mid-rise condominium is poised to cater to the growing demand and evolving homeowner preferences for suburban living. Strategic infrastructure investments, such as the Cavite-Laguna Expressway (CALAX) and the Bataan-Cavite Interlink Bridge, are fueling growth in Cavite's property market, as it improves the province’s connectivity and accessibility.

Read more