Homepage

ALLHC and FLOW Mark Milestone with Topping Off Ceremony for A-FLOW ML1 Data Center in PH

September 10, 2024
PR PHOTO ALLHC and FLOW topping off (shovel)

Laguna, Philippines– A-FLOW, a leading developer and operator of Data Centers in the Philippines, marked a major construction milestone with the recent topping off of its new ML1 Data Center.

A-FLOW is the joint-venture partnership between FLOW Digital Infrastructure (FLOW) and AyalaLand Logistics Holdings Corp. (ALLHC). The companies broke ground on the site in December 2022.

Strategically situated in Biñan, Laguna, the three-building carrier-neutral campus is designed to meet the highest standards of energy efficiency, scalability and security, with a focus on site resiliency and reliability. With the completion of the first building’s structural framework, the Data Center is slated to begin operations in Q4 2024 with an initial 6MW capacity ready for service.

Key features of the facility include:• Robust and secure infrastructure ensuring operational continuity• Dual power feeds for enhanced redundancy• Hyperconnected environment establishing network diversity and flexibility• Scalability to accommodate future business growth

Key representatives from FLOW and ALLHC were present at the ceremony, together with partners and vendors who played significant roles in the design and construction of the Data Center.

A-FLOW President and FLOW CEO Amandine Wang expressed, "The topping off of ML1 is a testament to the vision, commitment and dedication of all our vendors, partners and consultants who have contributed to this achievement. Their presence highlights the collective effort and shared ambition that has driven this project forward up to this pivotal moment."

A-FLOW Chairman and ALLHC President and CEO Robert S. Lao added, "This project embodies our commitment to supporting the growing demand for data storage as the Philippines transitions to a digital economy. We are proud to contribute and participate in this opportunity to provide the country’s need for Data Center solutions and digital infrastructure within the Philippines."

Monocrete Construction Philippines President and Chairman Manuel S. Mendoza stated, "Without the support of the A-FLOW team, this milestone could not have been possible. Congratulations to the shared success of the Monocrete and A-FLOW team!"

PR PHOTO ALLHC and FLOW topping off (shovel)
PR PHOTO ALLHC and FLOW topping off (shovel)
PR PHOTO ALLHC and FLOW topping off (slab)
PR PHOTO ALLHC and FLOW topping off (slab)

L-R: A-FLOW Chairman and ALLHC President and CEO Robert S. Lao, FLOW Head of Design & Construction Mr. Raj Kumar, A-FLOW President and FLOW CEO Ms. Amandine Wang, A-FLOW Director and ALLHC COO Patrick C. Avila, Monocrete Construction Philippines President and Chairman Manuel S. Mendoza

PR PHOTO ALLHC and FLOW topping off
PR PHOTO ALLHC and FLOW topping off
Tags:
New Developments
Share:

Latest Updates

Laurean Residences: A New Chapter of Prestige Living in Makati

September 2, 2025

Ayala Land Premier introduces Laurean Residences, a new beacon of modern luxury rising along Dela Rosa Street in Makati Central Business District. Conceived for a discerning niche within the luxury market, the development reimagines urban living as both sophisticated and connected—an address that resonates with the rhythm of the city while offering an intimate sanctuary at its heart.

Read more
Ayala Malls Evo City, a modern lifestyle destination with retail shops, restaurants, open-air walkways, and family-friendly spaces surrounded by greenery.

IFC, Ayala Land Expand Sustainability Financing Partnerships to Advance Green and Resilient Buildings in the Philippines

August 29, 2025

In a strategic move that underscores both sustainability and financial innovation, the International Finance Corporation (IFC) and Ayala Land, Inc. (ALI) are expanding their partnership to scale green and resilient buildings in the Philippines while supporting job creation. IFC is providing a second sustainability-linked loan (SLL) of up to PHP12.87 billion (US$225 million equivalent) to ALI, marking another milestone in sustainable finance in the real estate sector.

Read more
Aerial view of a modern industrial warehouse building with solar panels on the roof, loading dock area, parking space, and surrounding road infrastructure.

Artico Mandaue Completes Transition to 100% Renewable Energy

August 26, 2025

AyalaLand Logistics Holdings Corp. (ALLHC), the industrial parks and real estate logistics arm of Ayala Land, Inc. (ALI), has successfully transitioned its Artico Mandaue cold storage facility to a 100% renewable energy source for its operations. It completed the shift on July 26, 2025, through its participation in the government’s Green Energy Option Program (GEOP).

Read more